the nagoya-amishima section was fully opened to traffic and direct trains began to run . 名古屋 - 網島間が全通し、直通列車が運転開始。
the yatomi - kuwana section (4m53c ≒ 7 .50 km ) was opened to traffic by extending the line , and as a result , the nagoya-kusatsu section was fully opened to traffic . 弥富 - 桑名間(4M53C≒7.50km)が延伸開業し、名古屋 - 草津間が全通。
the kizu-nara section of nara railway (4m32c ≒ 7 .08 km ) opened to traffic by extending the line , and as a result , the kyoto-nara section was fully opened to traffic . 奈良鉄道 木津 - 奈良間(4M32C≒7.08km)が延伸開業し、京都駅 - 奈良間が全通。
the daibutsu-nara section (57c ≒ 1 .15 km ) of branch line was opened to traffic by extending the line , and as a result , the nagoya-nara section was fully opened to traffic . 支線 大仏 - 奈良間(57C≒1.15km)が延伸開業し、名古屋 - 奈良間が全通。
the kamese temporary station-inabayama temporary station section (64c ≒1 .29 km ) was opened to traffic by extending the line , and as a result , the minatomachi-nara section was fully opened to traffic . 亀瀬仮 - 稲葉山仮間(64C≒1.29km)が延伸開業し、湊町 - 奈良間が全通。